Question 1
Single choice

A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.

Identify the reason.

A.

The Production Priority was not populated in the new Work Definition WD2 during creation.

B.

The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation.

C.

The Item and Structure Name were changed in the new Work Definition WD2 during creation.

D.

The Start Data was not populated in the new Work Definition WD2 during creation.

Question 2
Multiple choice

In a Manufacturing Cloud post production support environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.

Identify two reasons.

A.

The work order operations do not have operations start or completion date.

B.

The scheduled resources are not part of the organization selected by the user.

C.

None of the operations include scheduled resources.

D.

The operations are missing sequence.

Question 3
Multiple choice

Identify three requirements fulfilled by nonstandard work orders.

A.

Rescheduling

B.

Repair

C.

Rework

D.

Prototype

Question 4
Multiple choice

Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.

Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud.

A.

Work Order Status GET method

B.

Work Orders GET method

C.

Work Order Status POST method

D.

Work Orders PATCH method

E.

Resource transaction POST method

F.

Resource transaction GET method

Question 5
Single choice

You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.

Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.

Which option shows the steps to complete the task using the mobile application?

A.

Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the
barcode to open the work order details page > Click Actions and select the E- mail icon> Select
required work orders> Select the e-mail client, enter the recipient's e- mail, and click Send.

B.

Select the infotile Customer to open the work order details page> Click Actions and select the E-mail
icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.

C.

Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the
barcode to open the work order details page> Select required work orders> Click Social icon (OSN) >
Select recipient, and click Share.

D.

Search the work order by customer name to open the work order details page> Click Actions and
select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-
mail, and click Send.

Question 6
Multiple choice

Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.

A.

Resource calendars of the work centers involved

B.

The primary work definition of the item

C.

The lot size of the item

D.

The shifts are defined in the plant calendar

E.

Plant calendar exceptions

F.

Resource calendar exceptions

Question 7
Multiple choice

Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

A.

There are no components attached to it.

B.

The Automatically Transact check box is deselected.

C.

The Automatically Transact check box is selected.

D.

The Count Point check is selected.

E.

The Count Point check box is deselected.

Question 8
Multiple choice

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must be completed and verified in the Work Definition area?

A.

Ensure the predefined work definition name ORA_MAIN name is active.

B.

Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.

C.

Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.

D.

Ensure the item is a standard item with a secondary item structure.

E.

Ensure there is only one default standard operation at a given point in time.

Question 9
Multiple choice

The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.

Which two reasons could cause this?

A.

The engineer does not have Data access to Items Attributes.

B.

The engineer does not have Data access to Items.

C.

The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.

D.

The engineer does not have Data access to Item Structures.

E.

The engineer does not have the Manage Work Definitions function privilege.

Question 10
Single choice

A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource
R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.

What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?

A.

8:00 PM

B.

12:30 PM

C.

2:00 PM

D.

4:00 PM

E.

1:00 PM