Question 1
Single choice

When configuring HA, which admission control policy should be used?

A.

Host Failure Cluster Tolerates

B.

CPU and Memory Percentage for Failover

C.

Standby Host

D.

None of the above

Question 2
Multiple choice

A business organization has different types of network traffic, and all the types of traffic must be kept separated. The design architect knows that the number of required networks is greater than the number of physical ports in the system.

Which three choices can the architect use to keep the traffic separated? (Choose three.)

A.

Combine vMotion, Management, and vSAN to one VMkenel port.

B.

Configure VLANs to create separate networks.

C.

Purchase hardware that supports a greater number of network ports.

D.

Utilize Private VLANs.

Question 3
Multiple choice

An organization's security policy requires a design where the ESXi hosts will be manageable only through vCenter Server.

Which two security configurations will help meet this requirement? (Choose two)

A.

enable lockdown mode strict

B.

disable DCUI access

C.

enable lockdown mode normal

D.

disable shell access

Question 4
Multiple choice

A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:

1. Uptime is critical during regular business hours when 95% of transactions occur. Application uptime must be 99.9% during those hours.
2. In a true disaster, the business can withstand a day of data loss and half a day of downtime.

3. The company is one year into a 5-year contact with the co-lo data center.
4. The building that is currently occupied no longer has any floor space available, but the company has three empty racks of space.
5. There are current contacts with Dell to provide servers and Cisco to provide network components.
6. The network team has standardized on an end-to-end 10Gb network.

Based on this information, which two statements are constraints for the new design? (Choose two.)

A.

There are only three available racks in the currently-leased data center.

B.

Corporate standards dictate the use of 10Gb throughout the network.

C.

Distributed Switches must be used.

D.

In four years, the company will outgrow its current data center space.

Question 5
Multiple choice

Which two types of workloads are efficiently consolidated when virtualized? (Choose two.)

A.

Workloads that do NOT require user input and are constantly processing large amounts of batched data.

B.

Workloads that will consume all available assigned resources.

C.

Workloads that are NOT CPU bound; most of their time is spent waiting for external events such as
user interaction.

D.

Workloads that do NOT require access to specific physical resources such as a hardware dongle or graphics card.

Question 6
Multiple choice

A solution architect has been tasked with designing a new environment that meets the growing needs of a company, and has obtained this information:

1. Each new server will use a single 2-port 10Gb Converged Network Adapter (CNA) for both network and storage access.
2. The network team has replaced all network equipment with a 10Gb fabric.
3. The new environment will host both web servers and Oracle database servers.
4. Resources will not be overcommitUid under regular upon at ions to mitigate performance issues.
5. The business needs a tool to understand application failures.
6. $lmillion has been budgeted for the data center expansion project.

Based this information, which two statements are requirements for the new design? (Choose two.)

A.

An Enterprise monitoring solution must be in place for Root Cause Analysis.

B.

The Oracle team will ensure sufficient database performance at the application level.

C.

vSphere provides the ability to overcommit resources without performance issues.

D.

vCPU count must be equal or less than the physical CPU core count unless there is a failure.

Question 7
Single choice

A company is designing a new vSphere cluster to support a mission-critical application.

1. The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.
2. The application consists of a group of 16 virtual machines, each with 8 vCPU configured.

Which solution satisfies the availability requirements?

A.

Guest OS-based software clustering

B.

vSphere High Availability

C.

vSphere High Availability Application Monitoring

D.

vSphere Fault Tolerance

E.

vSphere Site Recovery Manager

Question 8
Multiple choice

A solution architect has been tasked with designing a new environment for a company's growing needs, and has obtained this information:
1. Uptime is critical during regular business hours when 95% of the transactions occur. Application uptime must be 99.9% during those hours.
2. In a true Disaster, the business can withstand a day of data loss and half a day of downtime.
3. The company is one year into a 5-year contact with the co-lo data center.
4. The building that is currently occupied no hanger has any floor space available, but the company has 3 empty racks of space. The co-lo can provide up to 11KVA of power per rack.
5. There are current contacts with Dell to provide servers and with Cisco to provide the network components.
6. The network team has standardized on an end-to-end 10Gb network.

Based on this information, what are two requirements for the new design? (Choose two.)

A.

RTO of 24 hours.

B.

RTO of 12 hours.

C.

The application must be available 99.9% during business hours.

D.

11KVA of power is available per rack.

Question 9
Multiple choice

A university is going through an IT transformation project and is re-evaluating how to use technology to provide a better academic experience for its 15,000 students. The university is a current VMware customer and has a single data center.

1. Within that data center, they are using blade servers backed by a Fibre Channel array for its business

critical applications, and two iSCSI arrays (one for the development environment and one for the non-critical production environment).
2. Its VMware environment consists of three clusters. The first cluster contains all development virtual machines, the second cluster is dedicated to DMZ virtual machines (VMs), and the final cluster contains production VMs.
3. The university requires the ability to perform hardware maintenance without a service interruption, and can sustain only 4 minutes of downtime per month.

From the list below, which two are non-functional requirements? (Choose two.)

A.

Projected growth has been calculated by reviewing the last five years of actual growth.

B.

Provide for N+1 redundancy to support the environment during the maintenance window.

C.

There is sufficient power and cooling in the current data center.

D.

99.99% uptime for the environment.

E.

The WAN provider meets their SLA.

Question 10
Multiple choice

View the Exhibit.

Referring to the Exhibit, identify the two single points of failure in this design. (Choose two.)

A.

Intranet Switch

B.

Intranet Uplink

C.

Intranet vSwitch

D.

DMZ Switch

E.

DMZ Uplink

F.

DMZ vSwitch