Jon can already see issues in a particular project. But he also needs to:
1. work on setting Due Date on issues
2. transition issues from the Resolved column to the Closed column
His project was created using the Scrum project template and the simplified workflow has not been modified.
Which three additional permissions does he definitely need? (Choose three.)
You are a project administrator of DEV.Omar is a Jira administrator.
Identify two project settings that Omar can update in DEV but you cannot. (Choose two.)
A Scrum board contains issues from a single project. An extract of the project's permission scheme is shown.

Who can definitely see the Scrurn board and rank issues?
A Scrum project has the following five configured versions:

How many of them will be available in the versions panel of the project backlog?
You need a field that:
1. allows different options in different projects
2. allows options to be disabled where necessary
3. allows only a single value
4. allows a default value to be configured
Which field meets these requirements?
You need to display data on a dashboard that shows the correlation between the following:
1. the number of days that issues have been open
2. the number of comments on the issues
3. the number of participants on the issues
Identify the single gadget that meets these requirements.
You just started working as a scrum master in the Engine team.
The first thing you do is to analyze the Velocity Chart of the team's scrumboard as shown

Based on the Velocity Chart, what can you conclude about Combo Sprint 4?
Savresh can create issues and assign them to anyone in the Testers group. However, they cannot re-assign issues to Savresh.
What are two possible reasons for this? (Choose two.)
Your company recently created an internal IT project to track hardware requests. View the project
configuration below: Project: Hardware request Project lead: Allen Frank Default Assignee: Project lead

To test thetriaging process you create the first issue in the project and select the Macbook 13" component.
You don t update the assignee field and leave it to the default value of Automatic.
Based on the current configuration, which value will the assignee field show after creating the test issue?
Currently, the Done column of the Finance board shows all issues ever completed, regardless of age.
Now, the team wants to do a periodic clean-up of the Done column.
1. They want to do the clean-up whenever it is needed on an ad-hoc basis.
2. They want to be able to report on all the issues that were removed during each clean-up.
Which solution meets their need?