Question 1
Single choice

Concurrently developing software primarily requires more

A.

rigid version control

B.

robust change control

C.

extensive impact analysis

D.

detailed requirement tracking

Question 2
Single choice

When a software qualm-engineer is preparing an inspection report to present to management.
, what type of information should be included in the report?

A.

A summary-of the inspection results

B.

A summary-of the defects found by each inspector

C.

A detailed analysis of the results for each inspection

D.

A list of actions that management should take to correct the defects

Question 3
Single choice

Which of the following is an example of a poorly defined project milestone?

A.

Program specification completed

B.

Test plan approved by customer

C.

Coding 50% completed

D.

Program documentation approved

Question 4
Single choice

Which of the following problem-solving tools is most appropriate for breaking down ideas into progressively greater detail?

A.

Tree diagram

B.

Matrix diagram

C.

Affinity diagram

D.

Relationship diagram

Question 5
Single choice

Which of the following baselines starts the maintenance phase of the lifecycle?

A.

Product

B.

Allocated

C.

Functional

D.

Developmental

Question 6
Single choice

What type of information should a project's configuration status accounting communicate?

A.

Budget updates for the project

B.

Changes to the project plan

C.

Activity on baselined items

D.

Change control board minutes

Question 7
Single choice

The executive summary of a project management report should emphasize details related to

A.

completed tasks

B.

testing deliverables

C.

risks to the project

D.

stage phase containment status

Question 8
Single choice

Which of the following examples is the most appropriate product-level attribute template for a system determined to be safety-critical software?

A.

The system shall react to < type of accident or hazardous condition > by performing < type of action! s)
>

B.

The system shall < time out, log out. lock> access to < data, asset, function > after < defined time
period > of inactivity

C.

< quantity > of user < error type > mistakes made by a < user type or role > per < time unit > under <
defined conditions >

D.

< mean time or average time > for a < defined product or component > to experience < defined failure
type > under < defined conditions >

Question 9
Single choice

The diagram below corresponds to a 100-lme; high-level language program with a single loop that can be
executed no more than 20 times.

If this program was exhaustively tested, approximately how many possible paths would be executed0

A.

6

B.

20

C.

200

D.

1014

Question 10
Single choice

Which of the following scenarios warrants the adoption of software configuration management tools?

A.

A project with short timelines to completion

B.

A simple project with few files and little complexity

C.

A complex project with multiple modifications and frequent change requests

D.

A project without security requirements or specified control over files and changes

Showing 10 of 175 questions · Unlock the full set