You select the master data for production orders via production versions.
Which information is contained in a production version?
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50).
There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks.
What sequence type would you use to create the second sequence in the system?
Which functions can be triggered before releasing a production order? (Choose three)
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
Where can you define the default storage location for the material component of a production order? (Choose three)
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption.
Which of the following statements about consumption is true? (Choose two.)
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)