Question 1
Single choice

You select the master data for production orders via production versions.

Which information is contained in a production version?

A.

The explosion dates for the routing and BOM

B.

The routing and BOM alternatives to be used

C.

The default order type to be used

D.

The control parameters for selecting routings and BOM

Question 2
Single choice

The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50).
There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks.

What sequence type would you use to create the second sequence in the system?

A.

Substitute sequence

B.

Alternative sequence

C.

Parallel sequence

D.

Standard sequence

Question 3
Multiple choice

Which functions can be triggered before releasing a production order? (Choose three)

A.

Selection of a routing

B.

Selection of a BOM

C.

Stock determination

D.

Confirmation

E.

Scheduling

Question 4
Single choice

You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.

What do you have to consider in this scenario?

A.

Requirements planning considers only changes that are relevant for scheduling within the planning time fence.

B.

Planned orders are created within the planning time fence and automatically firmed by requirements planning.

C.

The MRP controller cannot create planned orders within the planning time fence.

D.

Planned orders that are created by requirements planning are shifted to the end of the planning time

fence.

Question 5
Multiple choice

Where can you define the default storage location for the material component of a production order? (Choose three)

A.

Routing

B.

Production supply area of a work center

C.

BOM header (product)

D.

Production version (product)

E.

Material master (component)

Question 6
Multiple choice

Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)

A.

Task list

B.

Work center

C.

Production version

D.

Bill of material

E.

Material master

Question 7
Multiple choice

Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

A.

Standard values (routing)

B.

In-house production time (material master)

C.

Transport time (routing)

D.

Formulas (work center)

E.

Operation control key (routing)

Question 8
Multiple choice

In your company planning strategies are used in the SAP-ECC demand management that are based on consumption.

Which of the following statements about consumption is true? (Choose two.)

A.

A consumption situation is dynamic and is always restructured with the planning run.

B.

Consumption can also take place between order reservations and planned independent requirements, depending on the strategy.

C.

Consumption always takes place on the material level between the planned independent requirements and the planned orders.

D.

The consumption parameters (consumption mode and consumption interval) can be set in the material

master or in the MRP group.

Question 9
Single choice

When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.

Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A.

Total planning online

B.

Multi-level single-item planning with the "display material list" option

C.

Interactive single-item planning for the delayed assembly

D.

Multi-level single-item planning with the "simulation mode" option

Question 10
Multiple choice

What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A.

Approved master recipes

B.

Digital signature

C.

Electronic batch record

D.

Availability check

E.

Resource selection