Q1 Single choice

Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.

Based on the chart above, what is the most appropriate next test phase? 1 credit

  • A

    Acceptance testing to verify the business process

  • B

    Acceptance testing to verify operational requirements

  • C

    Requirements testing as part of testing regulatory compliance

  • D

    Another system test cycle to verify defect resolution