Question 1
Single choice

What is a key benefit VxLAN?

A.

It reduces implementation cost of multiple VxBlock systems sharing data centers.

B.

It enables vMotion over Layer 3 subnets across geographic locations.

C.

It enables inter-VM communications among data center servers in different Layer 2 subnets.

D.

It can be configured in the hypervisor to support an NSX implementation.

Question 2
Single choice

What is the standard expected timeline to complete an RCM upgrade?

A.

2 months

B.

8 business days

C.

6 weeks

D.

3 weeks

Question 3
Single choice

What VMs are part of VxBlock Central?

A.

Multi-system Prepositioning (MSP), Element Manager, ESRS

B.

ESRS, Element Manager, Core

C.

Core, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

D.

Element Manager, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

Question 4
Single choice

According to the Test Plan guidelines, how should you validate redundancy capabilities of the network during a system failure?

A.

Remove one Aggregation switch power supply

B.

Disable the primary interface on Switch-A

C.

Power off the primary ToR switch

D.

Remove one power module from ToR switch A

Question 5
Single choice

What is a collection of similar endpoints representing an application tier or set of services within the ACI fabric?

A.

Tier

B.

Context

C.

Policy

D.

EPG

Question 6
Single choice

A Customer Engineer just connected to their new VxBlock 1000 that was shipped with NSX.
From where can the Customer Engineer confirm that the correct vSphere clusters are prepared for NSX?

A.

NSX Controller

B.

vCenter Web Client

C.

NSX Manager VAMI

D.

ESXi host VIBs

Question 7
Single choice

Which required NSX component abstracts the physical network and provides access-level switching in the hypervisor?

A.

Edge Services Gateway

B.

vSphere Distributed Switch

C.

Distributed Logical Router

D.

vSphere Standard Switch

Question 8
Single choice

Which document contains all software baseline information post-RCM upgrade?

A.

LCS

B.

MSP

C.

SCR

D.

Assessment Workbook

Question 9
Single choice

What is a benefit of Software Defined Networking?

A.

Simplifies licensing requirements

B.

Increases network-provisioning time

C.

Improves network management efficiency

D.

Reduces the amount of hardware required for the solution

Question 10
Single choice

A System Engineer is validating system cabling for a VxBlock 1000. They find that some ports on Fabric Interconnects 1A are not connected.

Which connections are missing?

A.

Network uplinks to Nexus switches

B.

Network uplinks to the customer network

C.

SAN uplinks to MDS switches

D.

Server uplinks to C-Series servers