Question 1
Single choice

During an initial setup of a Synergy environment, an integrator needs to enable or disable authorized Service access.

What will be the outcome when the integrator disables this service?

A.

Authenticated administrators will be unable to make changes to the system

B.

Authorized users will be unable to generate a support dump

C.

Authenticated administrators will be unable to access the system

D.

Authorized support will be unable to diagnose the system

Question 2
Lab simulation

A customer has the following configuration:

Frame 1
Bay 1 - HPE Synergy 12Gb SAS Connection Module
Bay 2
Bay 3 - HPE Virtual Connect SE 40 GB F8 Module
Bay 4 - HPE Synergy 12GB SAS Connection Module
Bay 5
Bay 6 - HPE Synergy 10 Gb Interconnect Link Module

Frame 2
Bay 1 - HPE Synergy 12Gb SAS Connection Module
Bay 2
Bay 3 - HPE Synergy 10Gb Interconnect Link Module
Bay 4 - HPE Synergy 12Gb SAS Connection Module
Bay 5
Bay 6 - HPE Virtual Connect SE 40Gb F8 Module
How many more frames can the customer add to their Synergy composable fabric?
(Note: Enter your answer in the answer field below.)

Question 3
Single choice

In a 3-frame HPE Synergy environment, how should an integrator place the image Streamer modules to allow for redundancy to all of the management connections?

A.

one Image Streamer module in frame 2, and a second Image Streamer Module in frame 3 (2 total)

B.

two Image Streamer modules in frame 2, and two Image Streamer modules in frame 3 (4 total)

C.

one Image Streamer module in each Synergy frame (3 total)

D.

two Image Streamer modules in frame 1 (2 total)

Question 4
Single choice

What must an integrator do before an existing cluster can be imported to the HPE Composer?

A.

The vCenter Server must be integrated with the HPE Composer

B.

The cluster must be vSAN enabled

C.

The HPE Composer must have at least two management interfaces to connect to the cluster

D.

The cluster must be enabled for HPE Composer integration

Question 5
Single choice

Refer to the exhibit.

How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?

A.

Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.

B.

Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.

C.

Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.

D.

Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.

Question 6
Single choice

Refer to the exhibit.

An integrator needs to add an FCoE connection to the server profile, but the FCoE connection type is not available.

What is the likely cause of this issue?

A.

FCoE capable interconnect modules are not installed in the Synergy frame

B.

Defined FCoE network is not associated with a SAN or does not have VLAN Id defined

C.

A FCoE connection is not available, as there is no LIG configured for FCoE connectivity

D.

The FCoE connection has not been added as a Fibre Channel connection within a server profile

Question 7
Single choice

An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.

Which configuration steps must the integrator perform to provide the customer with this functionality?

A.

Enable Remote Support and Insight Online Integration in the Composer UI

B.

Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard

C.

Configure OneView with iLO Amplifier pack

D.

Activate iLO Federation on all installed compute nodes

Question 8
Multiple choice

What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)

A.

assignment of IP addresses for NICs in an operating system

B.

assignment of IP addresses for Composer appliances

C.

assignment of IP addresses for PXE booting to a deployment server

D.

assignment of IP addresses for interconnect modules

E.

assignment of IP addresses for iLOs

Question 9
Single choice

Which policy can an integrator apply when creating a datastore using HPE OneView for vCenter Server?

A.

Data at Rest encryption policy

B.

Round Robin load balancing policy

C.

Recovery Manager Central policy

D.

virtual machine Restart policy

Question 10
Multiple choice

An integrator prepares deployment documents with the list of all the hardware and software components.
The integrator also needs a list of all infrastructure services deployed, with the functionality described.

Which services are provided by the vCenter Server component and should be placed in the report? (Choose two.)

A.

Auto Deploy

B.

Single Sign-On

C.

Update Manager

D.

Lookup Service

E.

Certificate Authority