A junior architect designed a solution based on HPE Synergy that must meet the following requirements:

Support at least 30 HPE Synergy 480 Gen10 Plus compute modules Interconnect modules must provide MAC and WWN virtualization All HPE Synergy frames must formulate a single management entity.

The management appliance should not be a single point of failure Connectivity to FC array should be available to all compute nodesThe proposal consists of:

1. 3 HPE Synergy 12000 frames
2. 6 HPE Composer 2 modules
3. 2 HPE Virtual Connect SE 100Gb F32 Module
4. 4 HPE Synergy 50Gb Interconnect Link Module

Which statements about this proposed design are true? (Select two)

Select all that apply.

  • A

    FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Module must be added.

  • B

    HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100Gb F32 modules.

  • C

    Remove 4 HPE Composer 2 modules from the design, as they are not required.

  • D

    The selected interconnect modules do not provide the requested WWN virtualization.

  • E

    The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules.