When adding a component line to a bill of materials (BOM), you discover that the Resource consumption check box is cleared and a warehouse is not specified.
Which warehouse will be used for the component line?
You need to identify which type of information you can obtain by performing bill of materials (BOM) calculations?
Which three types of information should you identify? Each correct answer presents part of the solution.
You need to identify what happens to the on-hand inventory of a bill of materials (BOM) and the components of the BOM when you report a BOM as finished.
What should you identify?
You plan to start using product change cases.
You need to identify what must be configured before you can create a new product change case.
What should you identify?
You need to create a new version of a bill of materials (BOM).
Which three options can be used to create a new version of the BOM? Each correct answer presents part of the solution.
You need to identify what information is available in the Composed of - tree form from a sales order line.
What should you identify?
You create a new product and a new bill of materials (BOM) for the product. The product is available in three different configurations.
Which statement about these configurations is true?
You create a new product that has a bill of materials (BOM). You add several lines to the BOM. Some of the lines are items. Some of the lines represent a sub-assembly.
You set the line type for one of the sub-assembly lines to Vendor.
In this situation, what does the Vendor line type indicate?
You have a bill of materials (BOM) item. All lines of the BOM item use a constant scrap amount and a variable consumption. You identify that when you have a production run of 100 items, the scrap cost is 10 US dollars and the unit cost is one US dollar.
You need to identify what will be the cost in the BOM calculation when you increase the size of production to 200 units.
Which cost should you identify?
You need to ensure that when users perform bill of materials (BOM) calculations, they receive a warning message if any manufactured components are missing an active BOM.
What should you configure?