Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once.
What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier?
Note: There are 2 correct answers to this question.

Select all that apply.

  • A

    Assign a rounding profile in the material master record of the planned material.

  • B

    Assign the indicator for quota splitting to the lot-sizing procedure being used.

  • C

    Set a maximum quota quantity in the quota arrangement item for each supplier.

  • D

    Set a maximum lot size in the quota arrangement item and activate the 1x checkbox.