Q1
Single choice
A mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw capacity. The mainframe server load is not too high, and they need drives with the lowest possible power
consumption to keep operating costs low. The customer will not increase the capacity of their mainframe applications in the future but rather invest later into their Power servers.
Which of the following solutions best meets these requirements at the lowest cost?