Exit C4090-453 IBM System Storage DS8000 Technical Solutions V3
Question 4 of 5
0% complete
Q4 Single choice

A customer has recently decommissioned their DS8700 wants to use the same data center floor space for a new D38 870.

What is an important fact for the technical specialist to discuss with the customer as it relates to data center requirements?

  • A

    The DS8870 uses more power than the DS8700 so more power cords will need to be ordered.

  • B

    The DS8870 uses a different power connector than the D68700 so new cords will need to be supplied.

  • C

    Air circulation in the DS8870 has changed and flows back to front so cooling vent locations will need to be adjusted.

  • D

    The rack dimensions on the DS8870 are larger than the D38700 so more floor space will be needed.