Exit HP0-D15 Administering HP CloudSystem Matrix Solutions
Question 5 of 5
0% complete
Q5 Single choice

Refer to the exhibits.

100% Real Q&As | 100% Real Pass

Your HP Cloud system Matrix configuration consists of ProLiant G7 and Gen8 server blades. From an old project, you have some ProLiant G6 server blades with QLogic QMH2562 8GB HBAs that you would like add to the configuration.

Using the HP CloudSystem Matrix 7.0 Compatibility Chart pages in the exhibit, which statement is correct?

  • A

    Generation 6 server blades are not specified in this configuration

  • B

    The QLogic 8GB HBAs must be installed in mezzanine slot 1

  • C

    The Flex Fabric Modules must be installed in interconnect bays 3 and 4

  • D

    Combining all three generations is supported