Exit HPE6-A86 HPE Network Switching Associate
Question 5 of 5
0% complete
Q5 Single choice

Your colleague is installing a new HPE Aruba Networking CX 8100 switch in a data center in the default configuration.

You monitor the peer switch port 1/1/1 status, connected with a 10Gb 3m DAC cable to the new switch, and validate that the cable is attached.

The port remains down.

What should you suggest your colleague do so the port can come online?

  • A

    Request to move the DAC cable to another port on the CX 8100 switch.

  • B

    Request to issue command: no shutdown on the port the DAC cable is connected to.

  • C

    Request to issue command: switching enable on the port the DAC cable is connected to.

  • D

    Request to swap the DAC cable between the switches for correct Tx/Rx alignment.