Exit NS0-521 Implementation Engineer - SAN ONTAP
Question 2 of 5
0% complete
Q2 Single choice

Click the Exhibit button.

A customer is testing a newly installed NetApp AFF A400 all-flash HA storage system. An SVM for FCP with a LUN on Node 1 has been configured, and a server has been connected as shown in the exhibit. For testing, the engineer plans to do a storage failover of Node 1.

After the failover, what is the expected status of the marked path?

  • A

    Unavailable

  • B

    Active/Optimized

  • C

    Active/Nonoptimized

  • D

    Offline